OPC + LPC

 0    32 flashcards    jakubglowala8
tải về mp3 In chơi tự kiểm tra
 
câu hỏi English câu trả lời English
limitations for ground resets
bắt đầu học
1. airplane on the ground and parking brake is set. 2. each procedure only once per flight leg.
how can we reset CBs during ground rests?
bắt đầu học
one by one, or all of them and reset all of them next
priority order of ROOT EICAS messages
bắt đầu học
WARNING, Electrical (AC than DC), MAU
shapes of TCAS identification
bắt đầu học
RA - red square, TA - yellow circle, Proximate traffic - blue solid diamond (within 6,5nm and 1200ft above or below) or beyond - blue hollow diamond
when FADEC commands an automatic - what next?
bắt đầu học
when ITT is 10°C lower than engine hot start limit - 2 additional engine starts are allowed
E2 - depulse
bắt đầu học
when FADEC detets hot satrt: fuel off for 2s and back on for 12s. (on the ground 2 cycles, in flight 10cycles)
IDG - abbreviation:
bắt đầu học
Integrated Drive Generator
When IDG 1(2) OIL message may display?
bắt đầu học
oil pressure drops below 140+/-25 psi OR temperature reaches 168+/-5°C
for how long holding IDG knob to the DISC position?
bắt đầu học
for 1 second
when automatic IDG disconnection may occur?
bắt đầu học
when temperature reaches 185,6°C
AC electrical power system comprises of:
bắt đầu học
2x IDGs, APU generator, RAT, 1x inverter
RAT is used as an emergency generator, supplying power to the:
bắt đầu học
ESS BUSES
MAU abbreviation
bắt đầu học
Modular Avionics Unit
Where is MAU 1,2,3 located?
bắt đầu học
MAU 1 and 2 in forward electronics bay. MAU 3 in the center electronics bay
When is BATT 1(2) OVERTEMP triggered on EICAS?
bắt đầu học
when temperature reaches 70°C for at least 2s
minimum battery 2 operating temperature for APU
bắt đầu học
-20°C
batteries are rated at ...A
bắt đầu học
27A
When is the horn sounds alerting ground personel?
bắt đầu học
on the ground, after more than 5min airplane powered by the batteries
DGR document (red book) - number:
bắt đầu học
ICAO 9481
EGPWS database consists of...
bắt đầu học
all hard surfaces runways greater than 3500ft in length
EGPWS colours
bắt đầu học
red +2000ft. orange +1000ft. yellow -250(gear down)/+500ft.
warning terrain and caution terrain
bắt đầu học
warning - 30s from impact. caution - 60s from impact
upset recovery conditions:
bắt đầu học
pitch up 25°, pitch down 10°, bank more than 45°
after what time will advisory messages on EICAS automatically acknowledged?
bắt đầu học
after 5 seconds
aural warnings sound in sequence:
bắt đầu học
EGPWS, TCAS, fire, overspeed, landing gear
cases when captain has to manually abort the engine start:
bắt đầu học
1. no positive oil pressure within 10s after N2. 2. no N1. 3. no its. 4. 90 seconds starter run. 5. its 740*C or 815*C. 6. hung start (n1 or n2) failing to accelerate to idle speed.
When 2 additional starts are allowed?
bắt đầu học
when faded automatically abort start when ITT is 10*C lower then limit and no ENG EXCEEDANCE EICAS message is displayed.
how should you finish reading a QRH checklist?
bắt đầu học
...... Procedure completed
FDR, QAR, CVR - abbrevaitions
bắt đầu học
FDR - Flight Data Recorder. QAR - Quick Access Recorder. CVR - Cockpit Voice Recorder
after the accident or incident the commander must secure flight data records by:
bắt đầu học
turn off in MCDU safety plugs: CBMENU/CB BY SYS/FDR/CVR. And it must be noted in LDP-60
How long the IRS alignment on the ground can take?
bắt đầu học
up to 17 minutes
TCAS II algorithms are based on the pilot starting the initial maneuver within
bắt đầu học
5 seconds of the RA or 2,5 seconds for additional corrective RA's

Bạn phải đăng nhập để đăng bình luận.